Skip to content
BRS INC. Engineering
A professional engineering company serving the mining industry of Wyoming for over 25 years
  • Home
  • Services
    • Geomorphic Reclamation
    • Mine and Mill Reclamation
    • Mine Permitting and Design
    • TSX 43-101 Technical Reports
    • Uranium
  • Our Team
    • Principal Engineer
  • Projects
    • Coal Mine and Reclamation Projects
    • Uranium Conventional
    • Uranium Mine Reclamation
    • Uranium ISR
  • Publications
  • Careers
  • Contact Us
  • Home
  • Services
    • Geomorphic Reclamation
    • Mine and Mill Reclamation
    • Mine Permitting and Design
    • TSX 43-101 Technical Reports
    • Uranium
  • Our Team
    • Principal Engineer
  • Projects
    • Coal Mine and Reclamation Projects
    • Uranium Conventional
    • Uranium Mine Reclamation
    • Uranium ISR
  • Publications
  • Careers
  • Contact Us

TSX 43-101 Technical Reports

Aug292013
Home

214-2

BRS has completed numerous uranium projects which include  mineral resource, PEA, and feasibility studies and technical reports for ISR, open pit, underground, conventional milling, and heap or vat leaching projects.

Category: HomeBy TysonAdminAugust 29, 2013

Author: TysonAdmin

Post navigation

PreviousPrevious post:Mine Design and PermittingNextNext post:RTK GPS ground surveys and unmanned aerial vehicle (UAV) surveying

Related Posts

AutoCAD Drafting for large civil & geologic engineering projects
August 31, 2022
RTK GPS ground surveys and unmanned aerial vehicle (UAV) surveying
August 31, 2022
Mine Design and Permitting
August 29, 2013
Mining and Reclamation
August 28, 2013
Uranium
August 28, 2013
Geomorphic Reclamation
August 28, 2013

TSX 43-101 Technical Reports

Mr. Beahm, is a Qualified Person (QP) under TSX regulations, a Professional Engineer, a Professional Geologist, and a Registered Member of the SME with 39 years of professional and managerial experience. In the past 5 years, BRS has completed numerous uranium projects which include a variety of mineral resource, PEA, and feasibility studies and technical reports for ISR, open pit, underground, conventional milling, and heap or vat leaching projects. These include 25 projects of which 10 involved either a PEA or some level of feasibility study and economic evaluation. In addition, BRS has completed numerous other evaluations of mineral resources and mineral economics for which a formal report was not required. During this same time frame BRS played a key role in the collection of environmental baseline data as well as project engineering, permitting and licensing of the Sheep Mountain Project, including mine permitting with the WDEQ and BLM, licensing with the NRC.

By TysonAdminAugust 29, 2013

Author: TysonAdmin

Post navigation

PreviousPrevious post:Coal Mine and Reclamation ProjectsNextNext post:Projects
© BRS INC. Engineering

(307) 857-3079 cooffice@brsengineering.com

Go to Top